top of page

Edmond 12-Inch Water Main Extension to the Town of Arcadia

EDMOND, OKLAHOMA

CLIENT

University of Oklahoma

MARKET

Municipal Engineering

HIGHLIGHTS

2,673-LF of 16-in.

ductile iron pipe

 

382-LF of 20-in.

ductile iron pipe

 

25-LF of 20-in. steel pipe

CLIENT

Edmond, Oklahoma

MARKET

Municipal Engineering

 

HIGHLIGHTS

3-Miles

12- & 8-Inch PVC Water Main

Evaluated 2 Alignment Options

Cabbiness Engineering has contracted with the City of Edmond to provide full and competent engineering services to design the extension of an existing 12-Inch PVC water main for approximately 3-Miles generally along a route commencing from the intersection of Douglas Boulevard and East Covell Road, then easterly to the intersection of East Covell Road and Westminster Road, thence south along Westminster Road to East Danforth Road, then east along East Danforth Road to a point of connection with the Town of Arcadia’s water distribution system, which will be an 8-Inch PVC pipeline. A secondary alignment was also investigated for cost and constructability comparisons. The secondary alignment proposed generally followed along a route commencing from the intersection of Douglas Boulevard and East Covell Road, then south along Douglas Boulevard to the intersection of Douglas Boulevard and East Danforth Road, thence east along East Danforth Road to a point of connection with the Town of Arcadia’s water distribution system.

 

Additionally, one-third (1/3) of the Design cost is attributed to the right-of-way acquisition needed for the selected alternative/alignment, which will be handled by Craig Cunningham of Smith Roberts Land Services (SRLS).

bottom of page