top of page

0.5-Mile Roadway Widening, Resurfacing & Intersection Improvements at East Alameda Street

NORMAN, OKLAHOMA

CLIENT

University of Oklahoma

MARKET

Municipal Engineering

HIGHLIGHTS

2,673-LF of 16-in.

ductile iron pipe

 

382-LF of 20-in.

ductile iron pipe

 

25-LF of 20-in. steel pipe

CLIENT

Norman, Oklahoma

MARKET

State Transportation

Municipal Engineering

 

HIGHLIGHTS

Widening of 2-Lane to a 5-Lane Roadway

Addition of a 10-Foot Paved Shoulder

The City of Norman contracted with Cabbiness Engineering to provide engineering services to analyze and prepare construction plans for the widening of East Alameda Street in Norman, Oklahoma.

Additional items to be incorporated within the design documents are coordinated utility relocations; a complete, detailed traffic study; prepared right-of-way acquisitions documents; and the submission of complete bidding documents in accordance with the City of Norman and the Oklahoma Department of Transportation (ODOT) standards.

The City of Norman has identified the project as follows:
Widen approximately ½ mile of East Alameda Street from two (2) lanes to five (5) lanes beginning at Ridge Lake Boulevard to 36th Avenue East and add a ten foot (10-foot) paved shoulder to East Alameda Street from approximately 36th Avenue East to 48th Avenue East. Inclusive with this project will be the improvements of the intersections of 36th Avenue East and 48th Avenue East at East Alameda Street.

bottom of page