top of page

Broadway Avenue Waterline Replacement

ENID, OKLAHOMA

CLIENT

University of Oklahoma

MARKET

Municipal Engineering

HIGHLIGHTS

2,673-LF of 16-in.

ductile iron pipe

 

382-LF of 20-in.

ductile iron pipe

 

25-LF of 20-in. steel pipe

CLIENT

Enid, Oklahoma

MARKET

Municipal Engineering

 

HIGHLIGHTS

12- to 8-Inch Waterline

Located in Downtown Enid

 

Completed Construction in 120 Days
 

Due to the City of Enid’s existing downtown waterline distribution system being drastically undersized, Cabbiness Engineering designed a plan that connected the existing 8-inch waterlines at Washington Street, Independence Avenue, Grand Avenue, and 2nd Street to 12-inch waterlines to create a more feasible and flexible-looped system.


The preliminary engineering phase began with a topographical survey that served as the basis of design. Additionally, during this phase, we evaluated existing waterline alignments and compared utility atlas data to ensure complete compatibility before final analysis and approval.


Additionally, with the project being located in the heart of downtown Enid, we had to generate a construction sequencing plan that accommodated the various businesses, residences, and general public that were directly, as well as indirectly, impacted. Another challenge our team faced with this project was the need to acquire a construction permit from, as well as work with the Union Pacific Railroad standards. All while completing construction in 120 working days.

bottom of page